Ground Floor Extension – Godbert Avenue, Chorlton Cum Hardy

This ground floor extension with wet room was constructed by UPS to a property in Manchester, On behalf of Manchester’s Service for Independent Living.

The project involved all groundworks including construction of the new foundations, brickwork, uPVC windows and doors and Hip roof. The ramp and handrails to the entrance of the new extension constructed and fabricated. We carried out all drainage works to the new bathroom, including installation of a new inspection chamber. All works were completed in line with Building Regulations and inspected at key stages by Building Control.

Internally, we installed new partitions to create the new living area and modern wet room and carried out all aspects of the plastering, joinery works, decorations, flooring and tiling, electrical wiring and fitted new radiators. In the new bathroom, we fitted new sanitary ware including WC, half-pedestal wash hand basin, thermostatic shower and grab rails positioned to meet the customers’ needs.

The clients carer has commented and has described the completed works as ‘Fantastic and an absolute blessing’

“Before the works commenced the client was sleeping in the family living room, travelling to the leisure centre to utilise their bathing facilities and didn’t have a sense of his own independence. The client is now able to comfortably shower which is really helping improve his skin conditions. He also has the independence he has always wanted – Thank you.”